Employer: PEDO
Summary: The project layout is planned on the right bank of siran river which is a tributary of the indus river. The project consists of several basic parts; civil works and mechanical works. The civil works include diversion and collection of water from river through intake, tunnel, surge tank and penstock. Diversion weir is located at the shortest possible width of siran river, where a tyrolean weir is proposed to be constructed. The powerhouse is located on a right bank of river siran.
CRITICAL QUANTITIES:
ROCK EXCAVATION: 173,224 CUM
TUNNEL EXCAVATION: 22,844 CUM
BACKFILL: 22,032 CUM
STONE WORKS: 1,755 CUM
SHOTCRETE: 1,439 CUM
CONCRETE LINING: 5,556 CUM
REINFORCED CONCRETE: 23,121 CUM
STEEL: 1,729 TON