Construction of Jahangeera Sawabi Road Project

Employer:           FHA

Summary:           The Project is Located in N.W.F.P. Province Pakistan. It is the busiest route between Swabi and Jhangeera Town.

Critical Quantities:

Length of Road – 12 KM

No of Culverts – 45

Width of Road – 7.3 M

Width of Shoulder (each Side) – 2.5 M

Excavation – 0.54 MILLION CFT

Embankment – 1.80 MILLION CFT

Sub-Base – 2.7 MILLION CFT

Water Bound Macadam – 1.60 MILLION CFT

Asphalt Concrete – 0.40 MILLION CFT

Asphalt Wearing Course – 0.25 MILLION CFT

Concrete – 0.21 MILLION CFT

Steel Reinforcement – 550 TON