Employer: NHA
Summary: The project comprise of 20.4 km long dual carriage way, two lane road. The road starts from burhan interchange and passes through agricultural & rolling terrain of potohar region and ends into jarikas. The road alignment is intersected by village road and kacha paths at many locations.
LENGTH OF RAOD: 20.40 KM
FLYOVER: 03 NOS
BRIDGES: 12 NOS
UNDERPASS: 09 NOS
BOX CULVERTS: 59 NOS
CRITICAL QUANTITIES:
EXCAVATION: 141,731 CUM TACK COAT: 989,759 SQM
BACKFILL/EMBANKMENT: 2,568,263 CUM PRIME COAT: 529,552 SQM
CONCRETE: 109,514 CUM GRANULAR SUB BASE: 118,776 CUM
PILES: 25,351 M AGGREGATE BASE: 111,781 CUM
STEEL: 14,851 CUM
ASPHALT BASE COURSE: 79,465 CUM
ASPHALT CONCRETE: 25,782 CUM