Employer: Saudi Star
Summary: The Project area is located in the Gambella People National Regional State of the Federal Democratic Republic of Ethopia. Gambella Alwero Rice Project (Garp-01) consists of Irrigation and Drainage system including construction of main canal (30.58 km), irrigation 3000 area with branch canal – 1 and branch canal – 2
Critical Quantities:
Excavation: 177 Million CFT
Embankment & Back Filling: 106 Million CFT
Sub-grade Preparation: 8.45 Million CFT
Concrete: 3.07 Million CFT
Steel: 3,000 Ton
Stone Work: 13.4 Million CFT
Geo-membrane: 19 Million SFT