CLIENT: SHYDO
Summary:
Location & Nature: The Project is Located in Bahrain Town near Swat District. Access Road, 3km Long Tunnel, Access Tunnel, Power House, Spillway, Tunnel Excavation, Concrete Work, Steel Works, Tunnel Excavation using drill blast method tunnel lining Conventional method for concrete using batching plant & Transit Mixer
Critical Quantities:
Length of Tunnel: 2,910 M
Rock Excavation: 150,000 CUM
Tunnel Excavation: 39,000 CUM
Rock Bolts: 18,000 M
Steel Reinforcement: 1,800 TON
Concrete: 1,8000 CUM