Construction of Taunsa Barrage Emergency Rehabilitation & Modernization Project

Employer:           Water & Power Development Authority (WAPDA) Summary:           The World Bank indicated their willingness in April 2004 to finance the Project. Consequently the Taunsa Barrage Rehabilitation Project was put on fast track and implemented from June 2005 to December 2008. Critical Quantities: Excavation – 25.2 Million CFT Fill – 9.37 Million CFT Concrete – 10,594,200 CFT Steel – 8500 Ton …

Construction of Bridge Over River Chenab at Head Muhammad Wala

Employer:           National Highway Authority Summary:           The Project is complete ahead of its schedule and bonus has been granted by NHA. The 1km long bridge is situated over river Chenab connecting district Muzzafargarah & district multan.it has 21 spans, each span is 41m long. There are total 82 girder, each having 150 ton weight. The girders were launched with company owned …

Construction of West Bank Bypass Project in Muzaffarabad City, AJK

Employer:           National Highway Authority Summary:           The first stay cable bridge in the history of Pakistan is located in azad jammu kashmir, Muzafarabad city over the river Jehlum. The bridge is also the highest bridge in Pakistan with geometer high pier in the centre. The bridge is 473 m long consisting of 246m extra dosed stay cables, portion, 59m long east …

Construction of Jahangeera Sawabi Road Project

Employer:           FHA Summary:           The Project is Located in N.W.F.P. Province Pakistan. It is the busiest route between Swabi and Jhangeera Town. Critical Quantities: Length of Road – 12 KM No of Culverts – 45 Width of Road – 7.3 M Width of Shoulder (each Side) – 2.5 M Excavation – 0.54 MILLION CFT Embankment – 1.80 MILLION CFT Sub-Base – …

CONSTRUCTION OF UNDERPASSES AT CHINA CHOWK, ISLAMABAD. (FAZL-E-HAQ UNDERPASS, NAZIM-UD-DIN UNDERPASS, JINNAH AVENUE UNDERPASS)

Employer: CAPITAL DEVELOPMENT AUTHORITY Summary:  The Project is located in the heart of Islamabad, in front of Prime Minister’s secretariat. GRC successfully managed traffic diversion over the three busiest routes of Islamabad i.e. Jinnah avenue, Nazim-ud-Din Road & Fazl-e-Haq Road. In order to construct the underpass a number of utilities were located.   Critical Quantities: Clearing & Grubbing – 0.29 MILLION …

CONSTRUCTION OF LOWER BARI DOAB CANAL IMPROVEMENT PROJECT LBDC/ICB-01

Employer: ABD & IRRIGATION Summary: The Project Is Located In Punjab Okara District Sahiwal. It starts from Rajanpure District. There exists high security risk in the vicnity of the Project. It involves 63 Km Canal Lining, 17 Nos.  Head Regulators, 02 Nos. Cross Regulators, 01 No. Fall Structure and 22 Nos. Other Structures over the Canal.     CRITICAL QUANTITIES:   LENGTH …

Comprehensive Improvement of the Parallel Roads Contract R881/3A(U.A.E)

Employer: Salini S.p.A Summary:           The flyover is located near Sheikh Zaid road, Dubai, UAE. It is 540 m long having 18 spans and each is about 30m long. The flyover is of box girder type and the deck slab is casted in one go. Critical Quantities: Flyover Length : 540 m Spans : 18 No Span Length : 30 m Concrete …

Construction of Kachhi Canal Project

Employer: Water & Power Development Authority (WAPDA) Summary: The Project is Located in Punjab & Some Part in Baluchistan Tribal Areas. It starts from raja pure District. There Exists High Security Risk in the Vicinity of the Project. It Involves 118 KM Canal Lining & 36 Structures over the Canal. It also involves deep excavation of more than 100 ft in some …

Construction of Earthern Platform, Flood Protection Works, Cofferdams and Steel Sheet Piling at Qadirpur Gasfield Project

Employer: OGDCL Summary: The Project was High Priority and Emergency Situation due to Severe Gas Shortage in the Country. Therefore was completed to Make this Platform and Flood Protection Works on Fast-track Basis. The Area was Highly Risky due to involvement of SINDH Kachha Area. In order to Complete the Project with in stipulated Time Huge Resources were deployed  I.E. 10 …

Grc daral khawar

Construction of Daral Khwar Hydro Power Project

Employer : Sarhad Hydel Development Organization (SHYDO) Summary :  Daral Khwar, Catchment area at dam site 250 km2, Mean Annual Discharge,                                        10.76m3/s, Total annual Flow 341 hm3.