Summary: 

Location & Nature: The Project is Located in Bahrain Town near Swat District. Access Road, 3km Long  Tunnel, Access Tunnel, Power House, Spillway, Tunnel Excavation, Concrete Work, Steel Works, Tunnel Excavation using drill blast method tunnel lining Conventional method for concrete using batching plant & Transit Mixer

Critical Quantities:

Length of Tunnel: 2,910 M

Rock Excavation: 150,000 CUM

Tunnel Excavation:  39,000 CUM

Rock Bolts: 18,000 M

Steel Reinforcement: 1,800 TON

Concrete: 1,8000 CUM